Wednesday, September 23, 2009

Across the Bay!

Current Location - Edward's Boatyard


View S/V SUNSHINE 2009 - 2010 in a larger map
Tuesday & Wednesday, September 22 & 23, 2009


After making a few stops along the way, we dropped Mom off to visit Aunt Helen and then headed to the boat. We arrived at about 2100 hours to find SUNSHINE floating high on her lines. Although we were tired, we had several tasks to perform before we could think about hitting the sack:
install the new floor;
install the new step
stow all the items that haven’t been put away;
load additional items.

Early the following morning (Wednesday), we power washed the topsides and installed the dodger. I’ve never had a boat this dirty before! It was a complete mess, probably from all the work that was being done on the tug boat and the traffic (dust). SUNSHINE Spent part of the summer adjacent to an old tug that required considerable work. Generators for welding equipment and other tools created considerable particulate matter that settled on SUNSHINE. We were also adjacent to the dirt driveway and although motorist slowed, they still created a lot of dust. We scrubbed for an hour to get her presentable. We still have to remove some annoying black spots, but we’ll attack that problem while we are underway.

BY 10015, we finally had things secure and the boat in decent shape. It took a couple of minutes, but both engines fired up with only a little coaxing. I slipped my lines and Anna Marie headed off to the car for the drive to Edward’s Boatyard on the western shore. We were only two hours behind schedule, but it didn't really matter because there was a heavy fog over the creek. The fog lifted about twenty minutes before I left the dock.

After navigating Worton Creek, I entered the bay to high level fog and a generally gray day. By 1130 hours, some blue sky showed itself. The temperature reached 84 degrees. Winds were in the 5 to 10 knot range and as the high level fog burned off, the sun got brighter and brighter. The course to my destination was somewhat circuitous as I had to stay clear of the Poole’s Island. It and the surrounding area is restricted by the military.

Having had only four hours sleep, I was extremely tired and, although it was great to be back on the water, I could hardly hold my eyes open. I found myself nodding off repeatedly.

The west side of Poole’s Island is new to me. The water was consistently around ten to fifteen feet deep; there were myriad crab pot floats to dodge; It was nice to see other sailors enjoying a pleasant day for sailing. As I navigated the Middle River, I became less tired. Frog Mortar Creek appeared off my starboard side and I headed up that creek, past Maryland Marina, where I caught a glimpse of S/V Kallista and S/V Canvasback Too. "CB Too" was sporting a brand spanking new bubble, made by Captain Dave. That’ll be a great addition for his southward trip!

I pulled into my assigned spot at Edward’s Boatyard and was surprised to see three Great Harbor trawlers. As luck would have it, Puffin and Lo Que Se A were two of them. This is their summer port!

Being both tired and hungry, Anna Marie and I went out to lunch after which, we visited with Gene and Judy (M/V Lo Que Se A) and then went to see Captain Dave and his new bubble. He is planning to head south either tomorrow afternoon or Friday and will be a about one week ahead of us. We expect to catch up with him along the way. We might also catch up with S/V Tally Ho. Andrew and Vanessa are leaving from St. Michael’s on Monday.

While driving home, my tiredness caught up with me. Anna Marie was getting coffee and tea from the roadside Starbucks; I fell asleep. After a fifteen minute nap, I was ready to go.

We picked Mom up at about 1930 and finished the drive home. After a few chores it was off to the sack! We'll be back on the 30th to try out the new engines.

Monday, September 21, 2009

Progress!

It didn't seem like much at the time, but when I made the list of the things we did this weekend, it was impressive.

We had a beautiful weekend for our final preparations before launch which is scheduled for Tuesday (September 22). In the span of 2 1/2 days, we completed the following tasks:

o Removed carpet liner;
o painted previously carpeted surfaces;
o built new companion way floor & dry fitted for installation;
o built new entry step;
o built wire chase boxes;
o built spice rack;
o built glass holder;
o compounded hulls (polished port);
o repaired fiberglass;
o the yard painted the bottom.

We are scheduled to arrive at Edward's Boatyard on Frog Mortar Creek, just off the Middle River, before noon on Wednesday, the 22nd, where new motors will be fitted.

So far, we're still on schedule to begin our southward cruise on October 3.

Tuesday, September 15, 2009

You Got It! More Work!

This report is for Sunday and Monday, September 13 & 14, 2009

Hey, are we having fun yet? Actually, we are. Preparing the boat for an extended cruise is a lot of work, but it is fun too! Unfortunately, we're running out of time so, when we have the opportunity to make the three hour drive to the boat, we work at a frantic pace while we're there.

On this trip, we arrived (Sunday, September 13, 2009) at about 1630 hours and we'll have to leave by 1330 hours tomorrow (Monday, September 14).

Tasks underway:
> Anna Marie prepped the surface, previously carpeted, in the companionway, galley and navigation area for painting.
> Bill began some fiberglass repairs (starboard bow, both keels and a few minor areas on both transoms) and compounded the outside of the port hull.
> We'll need to finish the fiberglass repairs and the compounding and waxing by September 21 because we have scheduled the yard to paint the bottom on that date.
> We scheduled SUNSHINE's splashing on September 22.
> On September 23, we are scheduled to arrive at Edward's Boatyard for the motor installation.

We may be able to do some waxing while the motors are swapped out. We hope to have enough time to "break" the motors in according to the manufacturers specs.

That's about it, We're getting down to crunch time!

Wednesday, September 9, 2009

More Preparation

In our continuing effort to upgrade SUNSHINE, we began work on the companion way floor. We're redesigning the way the floor is mounted and we're putting down new teak and holly in this area. We've ripped out the carpet and will paint the previously carpeted surfaces. Eventually we remove all of the carpet.

I also installed a new surface for mounting the captain's chair pedestal.

Tasks left to do...
o Finish the floor and step
o Wash, compound, wax
o Fiberglass the holes in the starboard hull, port keel, and patch the starboard keel
o Remove carpet by steps, sand and paint the area
o repair main salon bulkhead wall
o Bottom paint (yard task)

Thursday, September 3, 2009

Getting Ready!

Prior to today, we have visited SUNSHINE three times this summer and have accomplished a few minor tasks. It was hot and muggy all three times we visited, and on one occasion, we had all five grandchildren with us. After only an hour of work, we went to the pool where the kids had great fun for about three hours, before we made the three hour drive home.

On this day, we had cool temps in the morning and even though it climbed to a high of 83 degrees, we started our preparation work in earnest. It took several hours to get the waterline and the "Chesapeake" smile off the boat. Anna Marie cleaned the master suite while I began to reorganize some storage areas. We hope to free up some storage space and get a bit more organized before we depart Worton Creek Marina.

On our next visit, we start compounding and waxing the hulls and continue our attention on the inside. I hope to have fashioned a new floor for the companion way and salon. I hope to build a new companionway step, and new spice rack, and a new glass holder.

We are tentatively planning to have SUNSHINE splashed around the 23rd of September. We'll take her across the bay to the western shore where we'll have her re-powered with two new Yahama 9.9 hp Hi-thrust motors (updated versions of the existing motors). We'll break the motors in while on the bay and, with some luck, we hope to head south on or about October 3rd.

Stay tuned for additional information as we prepare for our 2009 - 2010 cruise.