Monday, October 12, 2009

Yehah! (Day 010)

From: Indian Creek Anchorage, VA MM 146.0

To: East River Anchorage, Mobjack Bay, VA MM 172.0 via Norview Marina and Zimmerman Marine on Broad Creek in Deltaville, VA. MM 152.6

L/L: 37 24 20N 76 21 05W

Distance Traveled: 50.6


Weather: Temp range 55 - 66; east wind 10 - 15 gusts to 20 (diminishing to 10 knots in the late afternoon); 2 - 3 foot seas made for a lumpy ride; late afternoon showers


Comment: Hold on to your hats, cowpokes. We're riding a bronco today. Picture this; feet wrapped around the seat pedestals, Left arms in the air and right hands holding on to the reins! The bay presented east winds of 15+ knots and three foot seas. We bounced around for an hour or so before a course change allowed for an easier motion.


Before hauling the anchor, Anna Marie made arrangements for a short haul by Zimmerman Marine at Norview Marina on Broad Creek in Deltaville (off the Rappohanock River). The mud hook was up at 0815 and we were underway. Once out of the protection of the land, the east wind made for very lumpy seas. Unlike yesterday, there were few sailboats and no trawlers on the bay today. It’s a tad rough!


We rounded the shoal on the north side of the Rappohanock and set a course for Broad Creek. After navigating the channel into the harbor, Anna Marie called Norview and was told the travel lift crew was standing by. We motored around the red roofed sheds to the waiting travel lift. SUNSHINE was high and dry by 1030 hours.


After a few misadventures, we got the gear oil changed in both engines. SUNSHINE was splashed at 1230 hours and we were immediately underway.


By now it was to late to consider Norfolk as our destination so we opted for Mobjack Bay. The sea state improved as the afternoon wore on and the wind calmed to 10 knots. We had a “level” ride up Mobjack Bay to the East River. We had the anchor down just after sunset near channel mark 13.


It’ll be up early tomorrow with Norfolk as our destination. We hope to beat the 15 - 20 knot wind predicted for the afternoon.


Sunday, October 11, 2009

Nice Day to be on the Water (Day 009)

From: Solomon’s Islands, MD Mill Creek ANchorage MM 97.5
To: Indian Creek Anchorage, VA MM 146.0
L/L: 37 41 48N 76 21 17W
Distance Traveled: 57.6

Weather: Sunny; light and variable; temp range 63 - 79 degrees; calm bay; water temp 69.0 degrees


Point No Point Lighthouse

Comment: The bay was calm today. We were in a parade of over one dozen sailboats and an equal or greater number of trawlers, most headed south. Besides the decrease in degrees of latitude, we observed the first pelican of the trip. Pelicans are usually the first harbingers on our southward progress. Dolphins are the next.
We anchored in Indian Creek in the very quiet Pitman Cove. I’ve use this anchorage one other time and we both agree that it may be better, although not as convenient for shopping, as Jackson Creek in Deltaville, VA.

Tug and Barge in Indian Creek







Sunset from Indian Creek anchorage in Pitman's Cove, Kilmarnock, VA

Saturday, October 10, 2009

Solomons Islands, MD Day 008

From: Galesville, MD MM 59.6
To: Solomon’s Island, MD MM 97.5
L/L: 38 29 04N 076 26 91W
Distance Traveled: 50.4
Hours Motoring: 8.0
Hours Sailing: 0
Elapsed Time: 8.0
Average Speed: 6.3

Weather: Overcast most of the day; some showers; temp range 70 to 73 degrees; NW wind 10 - 15 knots

Comment: We made it to the Solomon’s in record time (6 1/2 hours), thanks to good northwest wind. We spent most of the day over 8 mph while motor sailing. At one point, we hit 14.3 mph!!

We need to find a place that will give us a reasonable rate for a quick haulout so I can change the gear oil in the lower units of the new motors. Can you believe we are approaching 20 hours on the new motors already?

We fueled up at the Spring Cove Marina and then found a quiet anchorage on Mill Creek as Back Creek, our usual anchorage, was full.

Friday, October 9, 2009

Here We Go!

Look, it's October 8 and we are finally underway! The new motors require a "break in" period. That means slow going for the first couple of hours. As you can see in the photos, we had a decent day with plenty of sunshine. We enjoyed temps in the mid to high 70's and west wind @ 10 knots or less.



The two spans of the Chesapeake Bay Bridge as viewed from our deck.








Dousing sail for the approach to Annapolis!








The sun is setting as Sea Paws II welcomes us to the anchorage in Galesville, MD. We had a great visit with SUNSHINE's former owners!





Today (Friday, October 9) small craft warnings are posted. We made an effort to beat the predicted wind (south 10 - 15 gusting to 25) and four foot waves, by pulling the anchor at 0630. Our destination was only 25 miles distant (an anchorage off the Little Choptank River) with an ETA around noon. However, once out from the protection of the land, we found 15 knots of wind and 2 - 3 foot seas. The GPS ETA ballooned to 1600 hours as the wind and waves were on the nose and really slowed our progress. Rather than bounce around for nine hours to make 25 miles, we turned tail and headed back to the anchorage to listen to the wind scream through the rigging for the rest of the day.

Tomorrow promises to be a better day with west wind at 10 - 15 knots and two foot waves. That is a better option for sure!

Our current location: Galesville, MD Anchorage



View S/V SUNSHINE 2009 - 2010 in a larger map

Wednesday, October 7, 2009

The Motors Are In!

Greetings Gang - We are still hanging out at Edward's Boatyard. The wind on the bay is blowing at 25 - 35 knots with gusts over 40, so we decided to stay put until tomorrow, when the forecast predicts 10 - 15 knot out of the northwest. We might even put up the sails!

The "Happy Hour Season" started aboard M/V Lo Que Se A, a Great Harbor 37. What a magnificent vessel! Thanks for your hospitality, Judy and Gene! We were then invited aboard M/V Puffin (another magnificent Great Harbor 37) for dinner. Thanks Lois and Carl.

The fist days of Cruise 2009 - 2010 are told in the following pictures:


Saturday, October 3, 2009 - After provisioning the boat, we visited Baltimore. The kids liked pedaling the dinosaurs!











Sunday, October 4, 2009 - The "Moulton Mural" graces the bulkhead in the salon.













Monday, October 5, 2009 - Work begins on the installation of the new motors. This is a photo of the new starboard motor.












Tuesday, October 6 - The motors are in! SUNSHINE gets wet again!











Monday, October 5, 2009

We're Cruisin' - (Sorta)



Saturday, October 3, 2009 Day 1


Comment: Our 2009 -2010 Cruise starts TODAY! Yipee!


Not so fast! The new motors aren't installed yet. We can't go anywhere. What the heck, the house is closed up and we have transportation to the boat. WE are all provisioned and ready to go... except, the motors are installed yet (did I mention that already?).


No worries mate, we'll head down to Edward’s Boatyard with the Foster’s. Following a visit to Baltimore, they’ll drive our car back home for the winter. Thanks Matt, Sandi, Josh and Rose!


Before going to Baltimore, we hastily cut a frame for the mural (made by Terry Moulton) that will grace the main bulkhead in the salon. We’ll do the installation tomorrow.


During a quick visit to Beacon Light Marina, we discovered that the engines will be installed on Monday. We were hoping they’d be installed today, but they are working on harness and chokes in the shop. Monday seems realistic, from what we can tell.


So let's go to Baltimore with the Foster's. We arrived in time for lunch at P. F. Chang’s, after which the Foster’s headed off to the National Aquarium while Anna Marie and I alternately strolled the promenade and found park benches that we could use for people watching and enjoying the nice day. After the aquarium, the kids rode the Dinosaur pedal boats.


It was about 1800 hours and time for the drive back to the boat. Once there, the kids got to run around for a few minutes before we bid good by to Matt, Sandi and the kids.


Sunday, October 4, 2009 Day 2


Comment: Since we can’t be underway, we decided to finish several projects slated for completion while underway, We installed the Moulton Mural and frame, the documentation number board, the SUNSHINE picture and mounted the new Apple iMac Computer, complete with a custom made bracket and mounting shelf.


While they’re installing the engines tomorrow, we’ll waterproof the canvas and repair the leaking portlight.


Monday, October 5, 2009 Day 3


Comment: Good news, the motors arrived this morning and by 1700 hours, they were installed. Positioning the choke cables on the dashboard are the last items to be completed. That will happen tomorrow morning. According the the marina owner, Billy, we will be splashed first thing in the morning!


Right now, we plan to fire up tomorrow and check that everything is in working order. I expect that will take place in the afternoon, so we’ll probably motor around this area and depart for points south on Wednesday (weather permitting).


While the guys were working on the engines, we waterproofed the canvas and did more organizing and cleaning. We didn't get to the leaky portlight yet.


Thursday, October 1, 2009

Last Round of Boat Chores Before Departure!

Yes sir, we're getting near the bottom of our boat chore list! On this two day job list, we finished the floor install and trimmed it out; installed the new custom made glass and the spice racks, switched out barbecues (we're going with the charcoal Cobb Grill in lieu of the Force 10 gas grill (it blows out in wind over twelve knots) and installed a new mattress in the master stateroom.

The hull is washed and waxed and SUNSHINE is ready to go... almost! The people who are replacing the engines are still waiting for parts. Supposedly these parts should arrive any day. Once they get here, it shouldn't take long to get the motors in the boat and running.

The overnight temperature was cool... in the high 40's, telling us it's time to move south!

We're heading home this evening to finish closing the houses. We'll be back to the boat on saturday and will leave as soon as the engines are installed and we've had an opportunity to test them out.